Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      MADHUSUDHANA.M

      Construction of Water Supply/Lift Irrigation
      9.9 Year Bangalore/Bengaluru, 5.30 Lacs

      Education :

      B.Tech/B.E. from Karnataka state Open University 2011

      Current:

      Assistant Highway Engineer at Sobha ltd, Bangalore

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Er. VEDPRAKASH SINGH PARIHAR

      Construction of Water Supply/Lift Irrigation
      8.8 Year Indore, 4.70 Lacs

      Education :

      M.Tech from Dr. A.P.J. Abdul Kalam University, Indore 2021

      Current:

      Civil Engineer at Jagran Social Welfare Society

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MD. SHAFI QURAISHI

      Construction of Water Supply/Lift Irrigation
      5.5 Year Pakur, 4.70 Lacs

      Education :

      B.Tech/B.E. from IES IPS Academy , Indore RGTU , Bhopal 2013

      Current:

      Civil Engineer at Embassy Tech Zone , Pune

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ATUL SHANKAR PAWAR

      Construction of Water Supply/Lift Irrigation
      6.6 Year Pune, 4.70 Lacs

      Education :

      B.Tech/B.E. from SHIVAJI UNIVERSITY KOLHAPUR 2013

      Current:

      Sr. Structure Engineer at )DHOOTTECHNOANDINDUSTRIALPROJECT,PUNE

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RUPESH KUMAR

      Construction of Water Supply/Lift Irrigation
      6.6 Year Mumbai, 4.70 Lacs

      Education :

      B.Tech/B.E. from JNTUH 2010

      Current:

      Civil Engineer at Histyle Retail Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AZEEM HAIDER

      Construction of Water Supply/Lift Irrigation
      9.9 Year Lucknow, 5.30 Lacs

      Education :

      B.Tech/B.E. from Avadh University 2008

      Current:

      Civil Engineer at SHALIMAR CORP. LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Akshay Mangesh Navle

      Construction of Water Supply/Lift Irrigation
      4.4 Year Thane, 3.50 Lacs

      Education :

      B.Tech/B.E. from B.R.Harne College of Engineering & Technology/ Mumbai University 2016

      Current:

      Senior Manager at Dhanlaxmi Enterprises

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AMAN KUMAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Rohtak, 3.50 Lacs

      Education :

      B.Tech/B.E. from KALINGA UNIVERSITY 2020

      Current:

      Civil Engineer at CHERRY HILL INTERIORS PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SUNIL RAJ

      Construction of Water Supply/Lift Irrigation
      9.9 Year Palamu, 5.30 Lacs

      Education :

      B.Tech/B.E. from NRI Institute of Information Science & Technology (M.P) 2017

      Current:

      Civil Engineer at Yash Projects Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHANU KUMAR

      Not Available
      Not Available Bijnor, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      ROHAN SHIVAJIRAO

      Construction of Water Supply/Lift Irrigation
      9.9 Year Akola, 4.50 Lacs

      Education :

      B.Tech/B.E. from Sinhgad collage of Engineering Pandharpur 2014

      Current:

      Sr. Structure Engineer at ALFA CIVIL CONTRACTOR

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vaibhav Ramesh Aher

      Construction of Water Supply/Lift Irrigation
      5.5 Year Pune, 4.70 Lacs

      Education :

      B.Tech/B.E. from Pune University 2010

      Current:

      Sr. Highway Engineer at Yashada Realty Group Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Abhishek Singh

      Construction of Water Supply/Lift Irrigation
      7.7 Year Jaipur, 4.70 Lacs

      Education :

      Diploma from ICE University Greater Noida 2013

      Current:

      SITE ENGINEER at Larsen & Toubro Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SATISH KUMAR PANDEY

      Construction of Water Supply/Lift Irrigation
      7.7 Year Mumbai, 4.70 Lacs

      Education :

      B.Tech/B.E. from Monad University, Hapur, Uttar Pradesh 2013

      Current:

      Sr. Structure Engineer at J. KUMAR INFRAPROJECT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kapil kumar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Greater Noida, 3.50 Lacs

      Education :

      Diploma from Govt. Polytechnic Bijnor 2010

      Current:

      Civil Engineer at ATS Home Kraft Infra Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Shomesh Kumar Jaiswal

      Construction of Water Supply/Lift Irrigation
      5.5 Year East Champaran(Motihari), 4.70 Lacs

      Education :

      Diploma from PSBTE 2013

      Current:

      Civil Engineer at Rishita Developers Private Limited,Lucknow

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Umesh kumar Sahanee

      Not Available
      Not Available Ballia, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Yogesh M. Pandri

      Construction of Water Supply/Lift Irrigation
      5.5 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from Savitribai Phule Pune University. 2017

      Current:

      Civil Engineer at Dr. Vishwanath Karad’s MIT World Peace University

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Amar Ananda Bagadi

      Construction of Water Supply/Lift Irrigation
      4.4 Year Pune, 3.50 Lacs

      Education :

      Diploma from MSBTE 2010

      Current:

      Sr. Structure Engineer at Unique Group

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      BSD SUDHESH KUMAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Aligarh, 3.50 Lacs

      Education :

      Diploma from S.G.S.J. Poly. Khurja 2009

      Current:

      Civil Engineer at M/s BPTP Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MRIGENDRA NARAYAN

      Construction of Water Supply/Lift Irrigation
      5.5 Year Lucknow, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU 2014

      Current:

      Civil Engineer at UPPWD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      YOGENDRA KUMAR

      Construction of Water Supply/Lift Irrigation
      13.13 Year Ghaziabad, 8.20 Lacs

      Education :

      Diploma from Govt. Polytechnic, SORON Kashiram Nagar 2011

      Current:

      Sr. Structure Engineer at Ahluwalia Contract India Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Rajnish Pandey

      Construction of Water Supply/Lift Irrigation
      4.4 Year Gurgaon/Gurugram, 3.50 Lacs

      Education :

      Diploma from Digamber jain polytechnic(Govn) BARAUT 2010

      Current:

      Jr.Engg. Highway at Era infra engineering ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vikash kumar gupta

      Construction of Water Supply/Lift Irrigation
      8.8 Year Garhwa, 4.70 Lacs

      Education :

      B.Tech/B.E. from Maryland institute of Technology and Management , Jamshedpur 2016

      Current:

      Civil Engineer at M/S Jmc projects (india) Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RUPESH BHATI

      Construction of Water Supply/Lift Irrigation
      12.12 Year Gautam Buddh Nagar, 8.20 Lacs

      Education :

      Diploma from AIET Agra 2010

      Current:

      Senior Manager at ATS HOUSING PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MD GAUHAR KHAN

      Construction of Water Supply/Lift Irrigation
      7.7 Year Darbhanga, 4.70 Lacs

      Education :

      B.Tech/B.E. from U.P.T.U, Lucknow 2015

      Current:

      Civil Engineer at RAY PROJECTS PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VIKAS V. GAONKAR

      Construction of Water Supply/Lift Irrigation
      6.6 Year Sindhudurg, 4.70 Lacs

      Education :

      Diploma from MSBTE 2014

      Current:

      SITE ENGINEER at REDI PORT LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mithun Jadhav

      Construction of Water Supply/Lift Irrigation
      6.6 Year Mumbai, 4.70 Lacs

      Education :

      Diploma from Shetty institute of technology 2013

      Current:

      SITE ENGINEER at Vascon Engineers Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      GOURAB KUMAR PAL

      Construction of Water Supply/Lift Irrigation
      6.6 Year North 24 Parganas, 4.70 Lacs

      Education :

      B.Tech/B.E. from Maulana Abul Kalam Azad University Experience: Total 7+ Years in L&T ECC of Technology 2019

      Current:

      Civil Engineer at DFCC Railway Projec

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mohammed Abdul

      Construction of Water Supply/Lift Irrigation
      5.5 Year Churu, 4.70 Lacs

      Education :

      B.Tech/B.E. from Jagdish Prasad Jabharmal Tibrewala University, Jhunjhunu, Rajasthan 2014

      Current:

      Civil Engineer at Unitech Power Transmission Line ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vinit Keshav

      Construction of Water Supply/Lift Irrigation
      7.7 Year Varanasi, 4.70 Lacs

      Education :

      B.Tech/B.E. from SHIVAJI UNIVERSITY 2016

      Current:

      Civil Engineer at Balaji Enterprises

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Divakar .Y

      Construction of Water Supply/Lift Irrigation
      4.4 Year Nellore, 3.50 Lacs

      Education :

      B.Tech/B.E. from MJR College of Engineering and Technology 2014

      Current:

      SITE ENGINEER at ROHAN BUILDERS PVT LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAJKUMAR DE

      Construction of Water Supply/Lift Irrigation
      6.6 Year Hooghly, 4.70 Lacs

      Education :

      B.Tech/B.E. from Modern Institute of Engineering and Technology 2019

      Current:

      Civil Engineer at Aspira Group

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SOURAV GHOSH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Buradhwan, 3.50 Lacs

      Education :

      Diploma from WBSCTE 2012

      Current:

      Senior Manager at M/s Rohan Housing Pvt.Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kunal Bharat Mistari

      Construction of Water Supply/Lift Irrigation
      9.9 Year Pune, 5.30 Lacs

      Education :

      B.Tech/B.E. from T.M.E.S.J.T.Mahajan College of Engineering 2013

      Current:

      Civil Engineer at Nyati Builders pvt Ltd, Pune

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Gourab Das

      Construction of Water Supply/Lift Irrigation
      7.7 Year South 24 Parganas, 4.70 Lacs

      Education :

      B.A. from Calcutta University 2011

      Current:

      Civil Engineer at Celica Properties Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ArunKumar

      Construction of Water Supply/Lift Irrigation
      5.5 Year Bulandshahr, 3.50 Lacs

      Education :

      Diploma from Handia Polytechnic, Handia, Allahabad 2011

      Current:

      Civil Engineer at N.K.G Infrastructure Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MAHENDRA KUMAR SINGH

      Construction of Water Supply/Lift Irrigation
      7.7 Year Sidhi, 4.70 Lacs

      Education :

      B.Tech/B.E. from J.R.N.UNVERCITY RAJASTHAN 2015

      Current:

      Civil Engineer at ROHAN BUILDERS (I) PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JASWANT SINGH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Agra, 3.50 Lacs

      Education :

      12th from U.P Board 2006

      Current:

      Civil Engineer at KW Group rajnagar

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DHARMENDRA KUMAR.

      Construction of Water Supply/Lift Irrigation
      5.5 Year Agra, 4.70 Lacs

      Education :

      Diploma from Board of Technical Education University, Rajasthan 2010

      Current:

      Sr. Structure Engineer at OP Chains group, Agra

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SUJIT GHOSH

      Construction of Water Supply/Lift Irrigation
      6.6 Year North 24 Parganas, 4.70 Lacs

      Education :

      Diploma from Ramakrishna Mission Shilpamandira , Belur, Howrah 2012

      Current:

      Civil Engineer at AUROMA PROJECT PVT. LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      GUNJAN A DIXIT

      Construction of Water Supply/Lift Irrigation
      7.7 Year Pune, 4.70 Lacs

      Education :

      M.Tech from Autonomous University 2012

      Current:

      Assistant Highway Engineer at Classic Promoters & builders (Solitaire World)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ER.RAGHVENDRA MISHRA

      Construction of Water Supply/Lift Irrigation
      4.4 Year Lucknow, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU Lucknow 2014

      Current:

      Civil Engineer at SHALIMAR CORP LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Durgesh Mishra

      Construction of Water Supply/Lift Irrigation
      12.12 Year Bharatpur, 8.20 Lacs

      Education :

      Diploma from Vidhya Bhawan Polytechnic College, Udaipur (Raj.)Board Of Technical Education, Jodhpur (Rajasthan) 2010

      Current:

      Civil Engineer at Renaissance Build home Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Narendra Kumar

      Construction of Water Supply/Lift Irrigation
      11.11 Year Ghaziabad, 5.30 Lacs

      Education :

      B.Tech/B.E. from Uttar Pradesh technical university 2010

      Current:

      Civil Engineer at Ahluwalia Contracts India ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. Anand Babu Madhiwal

      Construction of Water Supply/Lift Irrigation
      4.4 Year Thane, 3.50 Lacs

      Education :

      B.U.M.S from Utkal University 2010

      Current:

      Civil Engineer at Godrej Properties Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sonawane Gokul Shashank

      Construction of Water Supply/Lift Irrigation
      4.4 Year Nashik, 3.50 Lacs

      Education :

      B.Tech/B.E. from AEC, Beed 2010

      Current:

      Civil Engineer at Ace Pipeline Contracts Pvt. Ltd, Mumbai

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DEEKSHITH K S

      Construction/Highway/Bridge/Tunnel
      9.9 Year Shimoga, Above Rs. 1000000

      Education :

      M.Tech from JNNCE 2016

      Current:

      Project Engineer at DRIPL

      KeySkills:

      Teamwork & Team Building

      About jobseeker:


    • img_avatar1

      Chinimaya Kumar Das

      Construction of Water Supply/Lift Irrigation
      5.5 Year Khordha, 4.70 Lacs

      Education :

      Diploma from Indian Institute of Plumbing Technique 2010

      Current:

      Civil Engineer at Allam Infinite (india) Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SANTOSH. B. KUMKAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Thane, 3.50 Lacs

      Education :

      MBA/PGDM from Welingkar institute of management 2018

      Current:

      Civil Engineer at MRG Hospitality & Infrastructure Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


Send message