Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      Kapil kumar

      Construction of Water Supply/Lift Irrigation
      5.5 Year Aligarh, 3.50 Lacs

      Education :

      B.Tech/B.E. from Uttar Pradesh Technical University 2014

      Current:

      Construction / Site Supervisor at DILIP BUILDCON LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AVNISH KUMAR

      Construction of Water Supply/Lift Irrigation
      8.8 Year Etah, 4.70 Lacs

      Education :

      B.Tech/B.E. from K.L.S Institute Of Engg And technology 2015

      Current:

      Bridge Engineer at Nippon Koei India Private Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      GUGULOTHU VENKAT

      Construction of Water Supply/Lift Irrigation
      4.4 Year Hyderabad / Secunderabad, 3.50 Lacs

      Education :

      Diploma from Education Government Model Residential Polytechnic Bhadrachalam 2004

      Current:

      Deputy Project Manager at PMC Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kush Dhiman

      Construction of Water Supply/Lift Irrigation
      7.7 Year Una, 4.70 Lacs

      Education :

      B.Tech/B.E. from Bahra Institute of Engg. & Nano Technology, Hoshiarpur 2012

      Current:

      Assistant Highway Engineer at Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Deepak Arora

      Construction of Water Supply/Lift Irrigation
      6.6 Year Karnal, 4.70 Lacs

      Education :

      B.Tech/B.E. from MANAV BHARTI UNIVERSITY 2013

      Current:

      Deputy Project Manager at E5 Infrastructure Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DEEPAK

      Construction of Water Supply/Lift Irrigation
      4.4 Year Nainital, 3.50 Lacs

      Education :

      B.Tech/B.E. from Karnataka State Open University 2015

      Current:

      Civil Engineer at Interarch Buildings Products Pvt.Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MOHAMMED OSMAN

      Construction of Water Supply/Lift Irrigation
      8.8 Year Gulbarga, 4.70 Lacs

      Education :

      Diploma from KCT POLYTECHNIC ENGINEERING COLLAGE. 2012

      Current:

      Senior Manager at ACME CLEANTECH SOLUTIONS PRIVATE LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAVI PRAKASH YADAV

      Construction of Water Supply/Lift Irrigation
      6.6 Year Kota, 4.70 Lacs

      Education :

      MBA/PGDM from Utkal University 2017

      Current:

      Assistant Highway Engineer at SABOO ENGINEERING Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRAVIN KUMAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from Nagpur University 2007

      Current:

      Senior Manager at WELSPUN ENTERPRISES LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sriniwas Attri

      Construction of Water Supply/Lift Irrigation
      5.5 Year Rohtak, 4.70 Lacs

      Education :

      B.Tech/B.E. from Royal Institute Of Management of Technology 2010

      Current:

      Civil Engineer at 1) L&T-MHI Power Boiler Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MAQSOOD AHMAD

      Construction of Water Supply/Lift Irrigation
      14.14 Year Prayagraj, 8.20 Lacs

      Education :

      Diploma from B.R Engineering Institute Agra (UPTU) 1999

      Current:

      Sr. Structure Engineer at ECR Buildtech Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RATNESH KUMAR DUBEY

      Construction of Water Supply/Lift Irrigation
      7.7 Year Mirzapur, 4.70 Lacs

      Education :

      Diploma from BTE U P Board 2011

      Current:

      Bridge Engineer at SANJAY CONSTRUCTION

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kundan Kumar Shukla

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ranchi, 4.70 Lacs

      Education :

      B.Tech/B.E. from Nagpur university 2015

      Current:

      Structural Engineer at National Highway Authority of India

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Anwarul Huq

      Construction of Water Supply/Lift Irrigation
      5.5 Year Pilibhit, 3.50 Lacs

      Education :

      Diploma from Government Polytechnic Institute , Shahjahanpur 2017

      Current:

      Highway Manager at M/s Velji Ratna Sorathia Infra Pvt.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ANIL KUMAR

      Construction of Water Supply/Lift Irrigation
      7.7 Year Rohtak, 4.70 Lacs

      Education :

      B.Tech/B.E. from NIMS IN DELHI 2017

      Current:

      Civil Engineer at JINIL ENC INDIA PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MANOJ KUMAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Bijnor, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU, Lucknow 2010

      Current:

      Deputy Project Manager at URC Construction (P) Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DIVYANSHU RAI

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ghazipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2016

      Current:

      SITE ENGINEER at Nippon Koei India

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KARANVERMA

      Construction of Water Supply/Lift Irrigation
      4.4 Year Gandhinagar, 3.50 Lacs

      Education :

      B.Tech/B.E. from GGSIP University 2019

      Current:

      SITE ENGINEER at SaumanshInfrastructurePvt.Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAJENDRA SHARMA

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Firoj Seikh

      Engineering & Construction
      4.4 Year Bardhaman, 12.00 Lacs

      Education :

      Polytechnic 3 Year from Malda polytechnic 2012

      Current:

      Deputy Project Manager at EVRASCON- SSVC JV

      KeySkills:

      Teamwork & Team Building

      About jobseeker:


    • img_avatar1

      BABRU BHAN

      Construction of Water Supply/Lift Irrigation
      4.4 Year REWARI, 3.50 Lacs

      Education :

      Diploma from Govt Poly Jhajjar Haryana 2010

      Current:

      SITE ENGINEER at H.G.INFRA ENGG. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MR. ABHAY KUMAR DUBEY

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ambedkar Nagar, 3.50 Lacs

      Education :

      M.Tech from Biju Patnaik Technical University (Odisha) 2021

      Current:

      Deputy Project Manager at M/s. RAM KRIPAL SINGH CONSTRUCTION Private Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MANIK SHARMA

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jammu, 3.50 Lacs

      Education :

      B.Tech/B.E. from Lovely Professional University, Phagwara, Punjab 2016

      Current:

      Sr. Structure Engineer at Adani Green Energy Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SRINIVAS RAO TIRUGATI

      Construction of Water Supply/Lift Irrigation
      5.5 Year East Godavari, 3.50 Lacs

      Education :

      Diploma from Sir C.R.R Polytechnic College, Elluru 2010

      Current:

      Deputy Project Manager at GVPR Engineers Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAVI Kumar TERLAPU

      Construction of Water Supply/Lift Irrigation
      10.10 Year Visakhapatnam, 5.30 Lacs

      Education :

      B.Tech/B.E. from . JNTU Kakinada 2010

      Current:

      Civil Engineer at Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABHISHEK KUMAR THAKUR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Madhubani, 3.50 Lacs

      Education :

      M.Tech from RGPV Bhopal 2019

      Current:

      Assistant Highway Engineer at NHSRCL

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SURJEETKUMAR

      Construction of Water Supply/Lift Irrigation
      7.7 Year Siwan, 4.70 Lacs

      Education :

      B.Tech/B.E. from Bharath University 2015

      Current:

      Sr. Structure Engineer at BSC–C&C‘JV

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Nilesh KUMAR

      Construction of Water Supply/Lift Irrigation
      7.7 Year New Delhi, 4.70 Lacs

      Education :

      Diploma from Board of Technical Education Uttar Pradesh 2014

      Current:

      Highway Engineer at Maccaferri Infrastructure Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mukesh kumar

      Construction of Water Supply/Lift Irrigation
      5.5 Year Bathinda, 3.50 Lacs

      Education :

      B.Tech/B.E. from kurukshetra University, kurukshetra, Haryana 2016

      Current:

      Assistant Highway Engineer at MG CONTRACTOR PRIVATE LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MADDU RAMBABU

      Construction of Water Supply/Lift Irrigation
      4.4 Year Vizianagaram, 3.50 Lacs

      Education :

      B.Tech/B.E. from Acharya Nagarjuna University 2018

      Current:

      Civil Engineer at V.K.Engg constructions.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Santosh kumar

      Construction of Water Supply/Lift Irrigation
      6.6 Year Patna, 4.70 Lacs

      Education :

      B.Tech/B.E. from CSVT University 2012

      Current:

      Deputy Project Manager at Jagdish Service contractors

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Rahul Kumar Raj

      Construction of Water Supply/Lift Irrigation
      4.4 Year East Champaran(Motihari), 3.50 Lacs

      Education :

      M.Tech from MDU Rohtak 2018

      Current:

      Structure Engineer at Almondz Global Infra consultant LTD JV Manglam Associates

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAVINDER KUMAR

      Construction of Water Supply/Lift Irrigation
      6.6 Year Meerut, 4.70 Lacs

      Education :

      Diploma from The Institute of permanent way engineers (INDIA) 2019

      Current:

      Civil Engineer at Apco Infratech Pvt.Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Bambam Kumar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Lakhisarai, 3.50 Lacs

      Education :

      B.Tech/B.E. from AKTU 2017

      Current:

      Assistant Highway Engineer at L&T LTD. (LARSEN & TOUBRO LTD.)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VINAY KUMAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Rohtas, 3.50 Lacs

      Education :

      B.Tech/B.E. from Uttarakhand Technical University 2016

      Current:

      Sr. Structure Engineer at Era Infra Engineering LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SATYABRATA TRIPATHY

      Construction of Water Supply/Lift Irrigation
      10.10 Year Puri, 5.30 Lacs

      Education :

      B.Tech/B.E. from National Institute of Technology Silchar 2011

      Current:

      Assistant Highway Engineer at LARSEN AND TOUBRO

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Amiya Kumar Maity

      Construction of Water Supply/Lift Irrigation
      4.4 Year Buradhwan, 3.50 Lacs

      Education :

      B.Tech/B.E. from Institute of Science & Technology 2016

      Current:

      Civil Engineer at M/s ELECTRO MECH ENGINEERS

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRAKASH PATEL

      Construction of Water Supply/Lift Irrigation
      10.10 Year Etawah, 5.30 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2010

      Current:

      Civil Engineer at Employer : SAI Consulting Engineers Pvt. Ltd. (Systra group)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DHANANJAY KUMAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Lucknow, 3.50 Lacs

      Education :

      B.Tech/B.E. from Uttar Pradesh Technical University 2010

      Current:

      Sr. Structure Engineer at ARDEE ENGINEERING PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Narendra Kumar Chaurasia

      Construction of Water Supply/Lift Irrigation
      7.7 Year Jaipur, 4.70 Lacs

      Education :

      B.Tech/B.E. from Government Engineering College REWA MP 2007

      Current:

      Structural Engineer at Consulting Engineers Group Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Aloke Bandhu Roy

      Construction of Water Supply/Lift Irrigation
      7.7 Year Dungarpur, 4.70 Lacs

      Education :

      Diploma from Malda Polytechnic, under West Bengal State Council of Technical Education, Malda 2010

      Current:

      Civil Engineer at JACOBS

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Dharmendra Kumar Chaudhary

      Railway Metro Construction Project
      6.6 Year Ballia, Rs. 500000 - Rs. 1000000

      Education :

      B.A. from Mahatma Gandhi Kashi Vidyapeeth varanasi 2016

      Current:

      Assistant Store Keeper at TATA project limited

      KeySkills:

      Email, Store Keeping

      About jobseeker:


    • img_avatar1

      KANTUBUKTA GOPI

      Construction of Water Supply/Lift Irrigation
      5.5 Year Vizianagaram, 3.50 Lacs

      Education :

      Diploma from Sai Krishna Polytechnic college, Bondapalli 2014

      Current:

      SITE ENGINEER at APCO Infratech Private Limited (APCO)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KARTHICK B

      Construction of Water Supply/Lift Irrigation
      5.5 Year Namakkal, 3.50 Lacs

      Education :

      B.Tech/B.E. from CARE Group of Intuitions, Trichy 2014

      Current:

      Civil Engineer at SHILPI ENGINEERING PVT LTD, MUMBAI.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sumant Tiwari

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ballia, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU 2008

      Current:

      Civil Engineer at Everest Industries limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VINOD SINGH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Mathura, 3.50 Lacs

      Education :

      Diploma from BTEUP 2008

      Current:

      Deputy Project Manager at m/s jai Shree infrastructure

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Jaiprakash Dadhich

      Construction of Water Supply/Lift Irrigation
      8.8 Year Jodhpur, 4.70 Lacs

      Education :

      B.Tech/B.E. from Amity University Rajasthan 2015

      Current:

      Civil Engineer at Geo Miler & Co. Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Susheel Kumar

      Construction of Water Supply/Lift Irrigation
      8.8 Year Jaipur, 4.70 Lacs

      Education :

      B.Tech/B.E. from H.N.B. Garhwal University, Srinagar, Uttrakhand 2010

      Current:

      Sr. Structure Engineer at SMEC India Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      K. SAKTHIMURUGAN

      Construction of Water Supply/Lift Irrigation
      8.8 Year Virudhunagar, 5.30 Lacs

      Education :

      B.Tech/B.E. from Indian Institute of Industry Interaction Education And Research 2019

      Current:

      Civil Engineer at Larsen & Toubro Construction

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Chintaharan sahani

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ballia, 3.50 Lacs

      Education :

      B.Tech/B.E. from Uttar Pradesh Technical University ,lucknow 2010

      Current:

      Civil Engineer at Kailash Prefab Engineers & Contractors

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like-fari Structure, Electric post, Lamb Post

      About jobseeker:


Send message