Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      Nishar Ahmad

      Construction of Water Supply/Lift Irrigation
      5.5 Year Jaipur, 4.70 Lacs

      Education :

      M.Tech from Kurukshetra University, India 2017

      Current:

      Civil Engineer at Rani Construction Pvt. Ltd, Goa.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Divesh Pandey

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ghazipur, 3.50 Lacs

      Education :

      Diploma from Lucknow University 2013

      Current:

      Sr. Structure Engineer at RVR PROJECTS PVT LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SUBHADIP DAS

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from KALINGA UNIVERSITY (AICTE & UGC) 2017

      Current:

      Manager- Structure at SURYODAYA INFRA PROJECTS (I) PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. RAJENDRA KUMAR JANGID

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ajmer, 3.50 Lacs

      Education :

      B.Tech/B.E. from RTU Kota 2019

      Current:

      Civil Engineer at L&T Construction

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAJESH KUMAR

      Construction of Water Supply/Lift Irrigation
      6.6 Year Etawah, 4.70 Lacs

      Education :

      B.Tech/B.E. from K.L.S Institute Of Engg And Technology, Bijnaur Uttar Pradesh (Gautam Buddh Technical University) 2011

      Current:

      Bridge Engineer at Nippon Koei India Private Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SANDEEP KUMAR MISHRA

      Construction of Water Supply/Lift Irrigation
      9.9 Year Angul, 5.30 Lacs

      Education :

      B.Tech/B.E. from RASHRASANT TUKADOJI MAHARAJ 2010

      Current:

      Assistant Highway Engineer at POWER MECH PROJECTS LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      POULAM CHAKRABORTY

      Construction of Water Supply/Lift Irrigation
      7.7 Year South 24 Parganas, 4.70 Lacs

      Education :

      B.Tech/B.E. from West Bengal University of Technology 2015

      Current:

      Civil Engineer at Hooghly Cochin Shipyard Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      FARMAAN KHAN

      Construction of Water Supply/Lift Irrigation
      5.5 Year Amroha, 3.50 Lacs

      Education :

      B.Tech/B.E. from Shri Venkateshwara University, Amroha 2015

      Current:

      Civil Engineer at Larsen and Toubro Ltd. ( Collabera Technologies pvt Ltd.)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ajaya Kumar Padhiyali

      Construction of Water Supply/Lift Irrigation
      7.7 Year Thane, 4.70 Lacs

      Education :

      B.Tech/B.E. from BPUT,Odisha 2014

      Current:

      Civil Engineer at Oriental Consultants Global India Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHAHAREYAR ALAM

      Construction of Water Supply/Lift Irrigation
      7.7 Year Banaskantha, 4.70 Lacs

      Education :

      B.Tech/B.E. from Guru jambheshwar university of science and technology ,Hisar 2015

      Current:

      Civil Engineer at Aarvee associates architecture engineering pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      A.SATHISH

      Construction of Water Supply/Lift Irrigation
      8.8 Year Kanchipuram, 4.70 Lacs

      Education :

      Diploma from Pallavan Polytechnic College 2013

      Current:

      Civil Engineer at Larson and Turbo Construction

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VivekKumar

      Construction of Water Supply/Lift Irrigation
      6.6 Year Jaisalmer, 4.70 Lacs

      Education :

      Diploma from PunjabTech University 2012

      Current:

      Sr. Structure Engineer at ADANIGREENENERGYLTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAMDULARSHARMA

      Construction of Water Supply/Lift Irrigation
      11.11 Year Gaya, 5.30 Lacs

      Education :

      Diploma from Pune polytechnic 2003

      Current:

      Civil Engineer at HARI CONSTRUCTION & ASSOCIATES PVT. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ALOK KUMAR RANJAN

      Construction of Water Supply/Lift Irrigation
      8.8 Year Patna, 4.70 Lacs

      Education :

      B.Tech/B.E. from Punjab Technical University, (Jalandhar) 2015

      Current:

      SITE ENGINEER at SP Singla Construction Private limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VIKASH ANAND SINGH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Samastipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from B.I.E.T Davangere, Karnataka 2015

      Current:

      Senior Manager at KBPL Udaipur.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. MAHESH KUMAR PATEL

      Construction of Water Supply/Lift Irrigation
      4.4 Year Mandla, 3.50 Lacs

      Education :

      Diploma from J.S. UNIVERSITY SHIKOHABAD (FIROZARD) U. P. 2017

      Current:

      Structural Engineer at Larsen & Toubro Limited [Heavy Civil IC]

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHAILENDRA SINGH TOMAR

      Construction of Water Supply/Lift Irrigation
      6.6 Year Veraval, 4.70 Lacs

      Education :

      B.Tech/B.E. from R.G.P.V 2014

      Current:

      Civil Engineer at Grasim Industries Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MOHITSUNDRIYAL

      Construction of Water Supply/Lift Irrigation
      6.6 Year Dehradun, 4.70 Lacs

      Education :

      B.Tech/B.E. from GraphicEraHillUniversity 2016

      Current:

      Senior Manager at DEEVEEPROJECTSLTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Amit Kumar Singh

      Construction of Water Supply/Lift Irrigation
      5.5 Year Kushinagar, 3.50 Lacs

      Education :

      Diploma from Board of Technical Education (GOVT. POLYTECHNIC) Gorakhpur 2011

      Current:

      Senior Manager at KEC INTERNATIONAL LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SANJAY SINGH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Dadra & Nagar Haveli, 3.50 Lacs

      Education :

      B.Tech/B.E. from Rajasthan Technical university, KOTA 2014

      Current:

      Senior Manager at Vijay M. Mistry Construction Pvt. Ltd., Ahmedabad

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Pradip Kumar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kanpur, 3.50 Lacs

      Education :

      Diploma from Imperial Institute of Management Science 2012

      Current:

      Deputy Project Manager at ARSS INFRASTRUCTURE PROJECTS Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AKASH PATEL

      Construction of Water Supply/Lift Irrigation
      10.10 Year Jalaun, 5.30 Lacs

      Education :

      B.Tech/B.E. from Hindustan college of Science & Technology, Farah, Mathura (UP) 2012

      Current:

      Civil Engineer at REACH INFRATECH CONSULTING PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vipin Singh

      Construction of Water Supply/Lift Irrigation
      5.5 Year Barabanki, 4.70 Lacs

      Education :

      B.Tech/B.E. from RGPV Bhopal 2015

      Current:

      SITE ENGINEER at RVA Infratech Pvt. Ltd,

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAMESH KUMAR YADAV

      Construction of Water Supply/Lift Irrigation
      7.7 Year Allahabad, 4.70 Lacs

      Education :

      Diploma from B.T.E.U.P 2010

      Current:

      DPM-Structure at KEC International Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Biswanil Chakraborty

      Construction of Water Supply/Lift Irrigation
      6.6 Year Nadia, 4.70 Lacs

      Education :

      Diploma from W.B.S.C.T.E. 2012

      Current:

      SITE ENGINEER at NCCLTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      YOGESH KUMAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Bharatpur, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU Lucknow 2010

      Current:

      Sr. Structure Engineer at DRA Infracon Pvt. ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      BABALPREET SINGH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Sri Ganganagar, 3.50 Lacs

      Education :

      M.Tech from Chaudhary Devi Lal University, Sirsa 2023

      Current:

      SITE ENGINEER at AECOM India Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAJKAMAL DAS

      Construction of Water Supply/Lift Irrigation
      3.3 Year Buradhwan, 3.50 Lacs

      Education :

      Diploma from ICE(I) 2014

      Current:

      Deputy Project Manager at MIDAAS CONSTRUCTION COMPANY PVT.LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Arjyaswar Padhiary

      Construction of Water Supply/Lift Irrigation
      4.4 Year East Singhbhum, 3.50 Lacs

      Education :

      Diploma from Uma Charan Patnaik Engineering School, Berhampur 2010

      Current:

      Project Manager - Construction at • TATA STEEL (TISCO) , Jamshedpur , Jharkhand

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      GAJENDRA KR. NAGAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Kota, 3.50 Lacs

      Education :

      B.Tech/B.E. from Rajasthan Technical University 2012

      Current:

      Civil Engineer at Adani Green Energy Ltd. (Solar Project)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Atul Kumar Priyadarshi

      Construction of Water Supply/Lift Irrigation
      5.5 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from PTU, Jalandhar 2010

      Current:

      Senior Manager at Larsen and Toubro (B&F)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kumar Gaurav

      Real Estate/Property
      6.6 Year GAZIABAD, 10.00 Lacs

      Education :

      B.Sc from MMC 2006

      Current:

      ENGINEER-BILLING & PALNNING at RG Build Solutions

      KeySkills:

      Management

      About jobseeker:

      Manager-Project, Billing .


    • img_avatar1

      Manga Ram

      Construction of Water Supply/Lift Irrigation
      4.4 Year Patiala, 3.50 Lacs

      Education :

      B.Tech/B.E. from I.K GUJRAL PUNJAB TECHNICAL UNIVERSITY 2018

      Current:

      Structure Engineer at M/S MRG CONSTRUCTIONS

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VIJAYAKUMAR D

      Construction of Water Supply/Lift Irrigation
      4.4 Year Bangalore/Bengaluru, 3.50 Lacs

      Education :

      B.Tech/B.E. from Govt.S.K.S.J.T.I,Kr circle Bangalore- 01 2014

      Current:

      SITE ENGINEER at K2K INFRASTRUCTURE INDIA PVT .LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAHUL KUMAR MALI

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from MAHATMA ROHILKHAND UNIVERSITY, UTTAR PRADESH 2014

      Current:

      Sr. Highway Engineer at EKANA SPORTZ CITY PVT LTD, LUCKNOW

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MD JANE ALAM

      Construction of Water Supply/Lift Irrigation
      6.6 Year Gopalganj, 4.70 Lacs

      Education :

      B.Tech/B.E. from AKTU LUCKNOW (U.P) 2010

      Current:

      SITE ENGINEER at SHUBHAM ASSOCIATES

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vikas Tiwari

      Construction of Water Supply/Lift Irrigation
      5.5 Year Gwalior, 4.70 Lacs

      Education :

      M.Tech from Sri Aurobindo Institute of Technology, Indore (M.P) 2021

      Current:

      SITE ENGINEER at M/s LCC Projects Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Rubal Gaur

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ghaziabad, 4.70 Lacs

      Education :

      B.Tech/B.E. from UPTU 2014

      Current:

      Civil Engineer at Nirala Estate

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABHINAV JAIN

      Construction of Water Supply/Lift Irrigation
      4.4 Year Meerut, 3.50 Lacs

      Education :

      B.Tech/B.E. from Shridhar university 2019

      Current:

      Civil Engineer at AJNARA INDIA LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAJKUMAR SINGH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Mumbai, 4.70 Lacs

      Education :

      MS/M.Sc(Science) from VEER BAHADUR SINGH PURANCHAL UNIVERSITY 2010

      Current:

      Civil Engineer at EVERSENDAI CONSTRUCTION PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABHISHEK G SALIAN

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      Diploma from GOVERNMENT POLYTECHNIC COLLEGE, MANIPAL. 2010

      Current:

      SITE ENGINEER at DS MAX PROPERTIES PVT LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Harvinder Singh

      Construction of Water Supply/Lift Irrigation
      8.8 Year Karnal, 5.30 Lacs

      Education :

      Diploma from G.B.N. Govt. Polytechnic Nilokheri (KARNAL) 2011

      Current:

      Project Manager - Construction at IMPERIA STRUCTURES LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Subhash Patel

      Construction of Water Supply/Lift Irrigation
      8.8 Year Ghaziabad, 4.70 Lacs

      Education :

      B.Tech/B.E. from “S.G.S.J. Polytechnic, Khurja, B.S.R. 2011

      Current:

      Senior Manager at PC Design private limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sanal Bhagat

      Construction of Water Supply/Lift Irrigation
      8.8 Year Pune, 4.70 Lacs

      Education :

      M.Tech from DY. Patil School of Engineering & Technology Pune University 2020

      Current:

      DPM-Structure at Cbre South Asia Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAKESH YADAV

      Construction of Water Supply/Lift Irrigation
      12.12 Year Ghazipur, 8.20 Lacs

      Education :

      Diploma from J.L.N. Polytechnic Sitapur 2012

      Current:

      Manager- Structure at Gaur Sons India Pvt.Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ANUP SATISH GUNDECHA

      Construction of Water Supply/Lift Irrigation
      6.6 Year Ahmednagar, 4.70 Lacs

      Education :

      B.Tech/B.E. from H.S.B.P.V.T Parikrama, Kashti 2016

      Current:

      Senior Manager at MAHAVIR CONSTRUCTION

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VEERAMANI A

      Construction of Water Supply/Lift Irrigation
      9.9 Year Jaipur, 5.30 Lacs

      Education :

      Diploma from GPT, Krishnagiri 2010

      Current:

      Civil Engineer at PRIDE GROUP

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Nanjundas wamy S

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from Nitte Meenakshi Institute of Technology - Bangalore 2013

      Current:

      Assistant Highway Engineer at AUROBINDO REALTY, Hyderabad, Telangana

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ehtashamuddin

      Construction of Water Supply/Lift Irrigation
      4.4 Year Rajgarh, 3.50 Lacs

      Education :

      B.Tech/B.E. from Mohammad Ali Jauhar University Rampur 2017

      Current:

      Civil Engineer at Vascon Engineers Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      K.JAYAPRAKASH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Vellore, 3.50 Lacs

      Education :

      B.Tech/B.E. from VIT UNIVERSITY, VELLORE. 2017

      Current:

      Civil Engineer at ICON INFRA SHELTERS INDIA PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


Send message