Civil Engineer
2019-05-31 - Presently working
Incoming Material receipt review of Material test certificate & Visual check for damages of material.
Ensuring during Pipe laying in trench or above ground, Excavation, Bedding for laying & jointing, shall be per approved L-Section.
Welder performance Qualification carried out as per approved procedure or ASME sec-IX.
Ensuring during or before welding fit up of field joint, enough to leave a uniform gap for butt joint. Ensure during welding, welding shall be carried out sequentially.
Ensuring After completion of welding visual inspection shall be done and all the surface defects shall be removing.
NDT shall be carried out as per approved procedure or as per IS-10234/1990 or as per API-1104 standard.
Ensuring the entire field joint is Oil, Grease and Salt shall be removing before external or internal coating.
After External Joint coating visual, thickness, carried out as per approved procedure.