Job seeker profile

Mr. RAKESH KUMAWAT


Project Manager - Construction
7.7


Personal information:


Name : Mr. RAKESH KUMAWAT
Birth Date : 1982-03-02
Country : India
Position: Project Manager - Construction

Work Area :


Skill:
  • Project Planning
  • Schedule Management
  • Project Execution as per MORTH
  • Team Management
  • Work under Pressure
  • Preparation of Highway Layer like Earth Work
  • GSB
  • WMM
  • DBM
  • BC
  • DLC and PQC
  • MS Office
  • MS Excel
  • OutLook
  • Road design and highway engineering
  • Team Lead
  • Project Scheduling
  • Industry: Construction/Engineering/Cement/Metals
    Functional area: Highway / Structure
    Designation : Project Manager - Construction
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 9.80 Lacs

    Profile summary:


    Not Available.

    Education details :


    Diploma
    Specialization : Civil Engineering
    Institute name: Utkal University
    Marks / Percentage : 58%
    Passing year: 2004

    Work Experience :


    Project Manager - Construction
    2018-02-28 - Presently working
    Company name : IRB Infrastructure Developers LTD
      Annual salary : 8.30 Lacs
    Industry : Construction/Engineering/Cement/Metals
    Functional area : Highway / Structure

    • Execution of Road work from preliminary stage to completion of work i.e. laying of Earth work, Embankment, Sub grade, GSB, WMM, BM, DBM & BC. • Fixing the T.B.M Pillars and taking of original ground levels and executing the work as per the design drawing. • Preparation of sub-grade, GSB, WMM, DBM and BC layer levels and checking of layer wise bed levels as per designed F.R.L. • Preparation of labour working bills. • Preparing daily progress report which was executed quantities • Mobilization of Labour, Machinery and materials at site. • Supervisor’s duties and work co-ordination and managing of Man power at site work. • Compaction test with the help of Quality control team. • Preparing Material requirement as per site condition. • Preparation of RFI as per design crust levels layer-wise and approved taken from department well in advance for smooth flow of execution. • To co-ordinate with department staff and sub-contractor in the period of execution and also field staff like sub-ordinates. • Preparation of site documents, drawings and specifications as per designed site condition. • Maintaining and preparation of monthly, weekly program me and achieved stage of construction. • Prepared and Maintaining levels as per designed with paver and manual.