Job seeker profile

Mr. JITENDRA THAKRE


Project Manager - Construction
6.6


Personal information:


Name : Mr. JITENDRA THAKRE
Birth Date : 1976-09-03
Country : India
Position: Project Manager - Construction

Work Area :


Skill:
  • Project Planning
  • Schedule Management
  • Project Execution as per MORTH
  • Team Management
  • Work under Pressure
  • Preparation of Highway Layer like Earth Work
  • GSB
  • WMM
  • DBM
  • BC
  • DLC and PQC
  • MS Office
  • MS Excel
  • OutLook
  • Road design and highway engineering
  • Team Lead
  • Project Scheduling
  • Industry: Construction/Engineering/Cement/Metals
    Functional area: Highway / Structure
    Designation : Project Manager - Construction
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 9.80 Lacs

    Profile summary:


    Not Available.

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: The institute of Civil Engineer
    Marks / Percentage : 55.83%
    Passing year: 2016

    Work Experience :


    Project Manager - Construction
    2018-10-31 - Presently working
    Company name : M/s SKS Infra Projects Pvt. Ltd. Agra (UP).
      Annual salary : 8.30 Lacs
    Industry : Construction/Engineering/Cement/Metals
    Functional area : Highway / Structure

    As a Site Engineer for Road construction (I) Baihar To Malajkhand road (Length 32.53 kms) and (II) Lanji to Risewada road (Length 26 kms) Two laning State Highway Project under MPPWD Balaghat (M.P.). Following are few head of works I had done there, (1) Preparation of design, drawing & Estimates. L-section, Cross section of road for computing the quantity of different items to construct the project. (3) Supervision and execution of work such as embankment, cutting, GSB, WBM, B.T. work, structure (slab type culvert, box type culverts, Hume pipe culvert.) work as per design, drawing and IRC specification with approved quality control norms.(4) Site survey for availability of material, manpower . Taking levels, fixing alignment, marking formation level & layout of structure. (5) Taking measurements and preparation billing of completed work, (6) To guide and direct all supervisory staff to do work. (7) Monitoring physically & financially progress etc.