Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      GUNJAN A DIXIT

      Construction of Water Supply/Lift Irrigation
      7.7 Year Pune, 4.70 Lacs

      Education :

      M.Tech from Autonomous University 2012

      Current:

      Assistant Highway Engineer at Classic Promoters & builders (Solitaire World)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ER.RAGHVENDRA MISHRA

      Construction of Water Supply/Lift Irrigation
      4.4 Year Lucknow, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU Lucknow 2014

      Current:

      Civil Engineer at SHALIMAR CORP LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Durgesh Mishra

      Construction of Water Supply/Lift Irrigation
      12.12 Year Bharatpur, 8.20 Lacs

      Education :

      Diploma from Vidhya Bhawan Polytechnic College, Udaipur (Raj.)Board Of Technical Education, Jodhpur (Rajasthan) 2010

      Current:

      Civil Engineer at Renaissance Build home Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Narendra Kumar

      Construction of Water Supply/Lift Irrigation
      11.11 Year Ghaziabad, 5.30 Lacs

      Education :

      B.Tech/B.E. from Uttar Pradesh technical university 2010

      Current:

      Civil Engineer at Ahluwalia Contracts India ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. Anand Babu Madhiwal

      Construction of Water Supply/Lift Irrigation
      4.4 Year Thane, 3.50 Lacs

      Education :

      B.U.M.S from Utkal University 2010

      Current:

      Civil Engineer at Godrej Properties Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sonawane Gokul Shashank

      Construction of Water Supply/Lift Irrigation
      4.4 Year Nashik, 3.50 Lacs

      Education :

      B.Tech/B.E. from AEC, Beed 2010

      Current:

      Civil Engineer at Ace Pipeline Contracts Pvt. Ltd, Mumbai

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DEEKSHITH K S

      Construction/Highway/Bridge/Tunnel
      9.9 Year Shimoga, Above Rs. 1000000

      Education :

      M.Tech from JNNCE 2016

      Current:

      Project Engineer at DRIPL

      KeySkills:

      Teamwork & Team Building

      About jobseeker:


    • img_avatar1

      Chinimaya Kumar Das

      Construction of Water Supply/Lift Irrigation
      5.5 Year Khordha, 4.70 Lacs

      Education :

      Diploma from Indian Institute of Plumbing Technique 2010

      Current:

      Civil Engineer at Allam Infinite (india) Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SANTOSH. B. KUMKAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Thane, 3.50 Lacs

      Education :

      MBA/PGDM from Welingkar institute of management 2018

      Current:

      Civil Engineer at MRG Hospitality & Infrastructure Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Praveen Kumar Tripathi

      Construction of Water Supply/Lift Irrigation
      4.4 Year Chitrakoot, 3.50 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2012

      Current:

      Civil Engineer at Gammon India limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Taniya saxena

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      ADARSHA S REVANKAR

      Construction of Water Supply/Lift Irrigation
      8.8 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from Dayanand sagar college of engineering. 2011

      Current:

      Civil Engineer at Prestige Estates projects Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Himanshu Chauhan

      Not Available
      Not Available Mainpuri, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Ayush walia

      Construction/Highway/Bridge/Tunnel
      10.10 Year Mandi, 12.00 Lacs

      Education :

      Polytechnic 3 Year from Sirda polytechnic 2015

      Current:

      DPM-Highway at Cab construction company

      KeySkills:

      Management

      About jobseeker:


    • img_avatar1

      Anirudha Behera

      Not Available
      Not Available Navi Mumbai, Not Available

      Education :

      B.Com from SSJ MOHAVIDYALAYA 2016

      Current:

      Store In charge at URC CONSTRUCTION CO.

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Ajay Shankar

      Construction of Water Supply/Lift Irrigation
      7.7 Year Noida, 4.70 Lacs

      Education :

      Diploma from Govt. Polytechnic Mirzapur U.P. 2011

      Current:

      SITE ENGINEER at ATS Infrastructure Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vrushabh Deepak Pawar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Nalasopara, 3.50 Lacs

      Education :

      B.Tech/B.E. from Shivajirao.s Jondhle College Of Engg. & Tech, Dombivali 2016

      Current:

      Civil Engineer at Bhooshan Kotwal Project Management

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MD WARIS ANSAR

      Construction of Water Supply/Lift Irrigation
      11.11 Year Rohtas, 5.30 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2014

      Current:

      SITE ENGINEER at JAI PRAKASH ENTERPRISES

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Krishan Kumar Yadav

      Construction of Water Supply/Lift Irrigation
      8.8 Year Faridabad, 5.30 Lacs

      Education :

      Diploma from Maharishi Dayanand Polytechnic 2011

      Current:

      SITE ENGINEER at Tata Projects Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Satyanarayan pareek

      Construction Building/Highrise Building/Commerical Building
      4.4 Year Sardarshahar, Rs. 30000 - Rs. 35000

      Education :

      M.A from maharaja ganga singh university 2023

      Current:

      ERP OPERATOR at Creative projects Pvt Ltd Jaipur

      Previous:

      ERP OPERATOR at Creative india infra Pvt Ltd Jaipur

      KeySkills:

      Negotiation, Accounting, Management, Email

      About jobseeker:

      Experienced Store Incharge with expertise in inventory management, stock control, material receipt and issue, record maintenance, and efficient store operations. Skilled in ensuring accurate inventory and timely material availability.


    • img_avatar1

      Nitesh Singh

      Not Available
      Not Available Sitapur, Not Available

      Education :

      B.Com from Lucknow University 2018

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Shiva Prasad

      Construction/Highway/Bridge/Tunnel
      25.25 Year Varanasi, 30.00 Lacs

      Education :

      Polytechnic 3 Year from JRN University 2000

      Current:

      General Manager at Kalyan Toll Infrastructure Ltd

      KeySkills:

      Management

      About jobseeker:


    • img_avatar1

      Sujeet kumar

      Not Available
      Not Available Vaishali, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      SANTANU JENA

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ganjam, 3.50 Lacs

      Education :

      B.Tech/B.E. from BPUT (ODISHA) 2014

      Current:

      Civil Engineer at Dilip Buildcon Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ajay Karele

      Construction of Water Supply/Lift Irrigation
      4.4 Year Bhopal, 3.50 Lacs

      Education :

      B.Tech/B.E. from Truba Institute of Science & Technology Bhopal 2014

      Current:

      Assistant Highway Engineer at Built well solution pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SK RAFIKUL ISLAM

      Construction of Water Supply/Lift Irrigation
      8.8 Year Purba Medinipur, 4.70 Lacs

      Education :

      Diploma from W.B.S.C.T.E. 2011

      Current:

      Civil Engineer at W.B.S.C.T.E.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Er. RINKU YADAV

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ashok Nagar, 3.50 Lacs

      Education :

      B.Tech/B.E. from R.I.T Indore 2015

      Current:

      Manager- Structure at Bhavna engg Company Pvt ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHOUBHIK BISWAS

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kolkata, 3.50 Lacs

      Education :

      B.Tech/B.E. from Greater Kolkata College of Engineering & Management. 2019

      Current:

      Civil Engineer at SWAYAM CITY

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Akhilesh Chandra yadav

      Construction/Highway/Bridge/Tunnel
      16.0 Year Jaunpur, 6.55 Lacs

      Education :

      Polytechnic 3 Year from BTE 2008

      Current:

      P & M MANAGER at Atlas construction India pvt Ltd

      KeySkills:

      Management

      About jobseeker:


    • img_avatar1

      PRAJAKTA ASHOK KADAM

      Construction of Water Supply/Lift Irrigation
      7.7 Year Pune, 4.70 Lacs

      Education :

      B.Tech/B.E. from AISSMS COE 2016

      Current:

      Civil Engineer at Paranjape Schemes construction ltd. Pune

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      NAKUL KUMAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jaipur, 3.50 Lacs

      Education :

      Diploma from UTTAR PRADESH TECHNICAL UNIVERSITY 2011

      Current:

      SITE ENGINEER at GAUR SONS REALTY PVT LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KUMAR S. KOUDI

      Construction of Water Supply/Lift Irrigation
      9.9 Year Srikakulam, 5.30 Lacs

      Education :

      B.Tech/B.E. from Vishveshwarayya Technological University, Belgaum, KA 2015

      Current:

      Senior Manager at Sobha Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHRIKANT BALKRUSHNA RAJE

      Construction of Water Supply/Lift Irrigation
      5.5 Year Satara, 4.70 Lacs

      Education :

      B.Tech/B.E. from K.B.P .College of Engineering & Polytechnic Satara 2010

      Current:

      Senior Manager at Anand Realtors (f5 Realtors)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Swapnil Dhangar Amalner

      Construction of Water Supply/Lift Irrigation
      4.4 Year Gondia, 3.50 Lacs

      Education :

      B.Tech/B.E. from North maharashtra University, jalgaon 2016

      Current:

      Jr.Engg. Structure at Riviera Infraprojects Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MANOJ PATIL

      Construction of Water Supply/Lift Irrigation
      11.11 Year Bhopal, 5.30 Lacs

      Education :

      B.Tech/B.E. from RAJEEV GANDHI TECHNICAL UNIVERSITY. R.K.D.F, BHOPAL 2013

      Current:

      Civil Engineer at THE ART OF LIVING FOUNDATION

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      GYANENDRA SINGH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ghaziabad, 3.50 Lacs

      Education :

      B.Tech/B.E. from S.I.E.T 2012

      Current:

      Assistant Highway Engineer at JLL Building operation Pvt.ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MANISH KUMAR

      Construction of Water Supply/Lift Irrigation
      8.8 Year Lucknow, 5.30 Lacs

      Education :

      Diploma from Govt. polytechnic 2015

      Current:

      JR. ENGINEER at UPHB LUCKNOW

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. Sonu Kumar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Hapur, 3.50 Lacs

      Education :

      Diploma from BTE (UP)/D.N.POLY MEERUT 2009

      Current:

      Sr. Structure Engineer at ACE GROUP

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      CHIRANJIB GHOSH

      Construction of Water Supply/Lift Irrigation
      9.9 Year Bankura, 4.70 Lacs

      Education :

      B.Tech/B.E. from W.B.U.T 2008

      Current:

      Civil Engineer at Quest Properties India Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAHUL PAL

      Construction of Water Supply/Lift Irrigation
      9.9 Year Kanpur, 5.30 Lacs

      Education :

      Diploma from BTEUP, LUCKNOW 2012

      Current:

      SITE ENGINEER at M/s. RELIANCE JIO INFOCOMM LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AVINASH GANPAT GHODERAO

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      MAAZ ALI KHAN

      Construction of Water Supply/Lift Irrigation
      5.5 Year Aligarh, 3.50 Lacs

      Education :

      M.Tech from SVU (Gajraula) 2010

      Current:

      Civil Engineer at VSS BUILDCON PVT. LTD NOIDA

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRIANSHU CHAKRABORTY

      Construction of Water Supply/Lift Irrigation
      7.7 Year South Dinajpur, 4.70 Lacs

      Education :

      Diploma from WBSCTE 2010

      Current:

      Senior Manager at Rohan Builder's India pvt ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PavanKumarPandey

      Construction of Water Supply/Lift Irrigation
      6.6 Year Bharatpur, 4.70 Lacs

      Education :

      Diploma from BTER,Jodhpur 2011

      Current:

      Senior Manager at MojikaRealEstateDevelopersPVTLTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      NITIN WAMANRAO DHOTE

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      MOHIT KUMAR

      Construction of Water Supply/Lift Irrigation
      9.9 Year Gautam Buddh Nagar, 5.30 Lacs

      Education :

      Diploma from B.T.E.U.P. 2010

      Current:

      SITE ENGINEER at Mahaluxmi Infrahome Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Tanmay Kapoor

      Construction of Water Supply/Lift Irrigation
      4.4 Year Lucknow, 3.50 Lacs

      Education :

      B.Tech/B.E. from Integral University, Lucknow 2014

      Current:

      Civil Engineer at 11.18 MW Solar Power UTCL Aditya Chittorgarh,Rajasthan

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Nagsen Jagdish Kamble

      Construction of Water Supply/Lift Irrigation
      4.4 Year Navi Mumbai, 3.50 Lacs

      Education :

      Diploma from Utkal University 2010

      Current:

      Civil Engineer at Dilip Buildcon Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRADHAP.A

      Construction of Water Supply/Lift Irrigation
      8.8 Year Krishnagiri, 4.70 Lacs

      Education :

      B.Tech/B.E. from SOBHA DEVELOPERS. 2018

      Current:

      Civil Engineer at SOBHA DEVELOPERS.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      BALRAJ AGGARWAL

      Construction of Water Supply/Lift Irrigation
      5.5 Year Fatehabad, 3.50 Lacs

      Education :

      Diploma from D.B.S.C.R. Govt. Polytechnic, Sampla, (Rohtak) 2013

      Current:

      Civil Engineer at D.B.S.C.R. Govt. Polytechnic, Sampla, (Rohtak)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


Send message