Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      HARKESH SINGH

      Construction of Water Supply/Lift Irrigation
      6.6 Year Bulandshahr, 4.70 Lacs

      Education :

      Diploma from Govt.Polytechnic Ghaziabad 2007

      Current:

      Senior Manager at FORTUNEBUILDCON

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Urman Singh

      Construction/Highway/Bridge/Tunnel
      1.1 Year Moradabad, Rs. 250000 - Rs. 500000

      Education :

      Polytechnic 3 Year from Government polytechnic Moradabad 2025

      Current:

      Jr.Engg. Structure at MKC INFRASTRUCTURE LTD

      KeySkills:

      Leadership, Communication, Quick learning, Teamwork

      About jobseeker:


    • img_avatar1

      ANMOL GIRI

      Construction/Highway/Bridge/Tunnel
      6.0 Year Saran, 3.75 Lacs

      Current:

      HR Executive at GANPATI BHARAT PVT LTD

      KeySkills:

      HR Administration, HR Operation, Recruitment, OnBoarding, Payroll Processing, Resume Screening, Interview Scheduling, Offer Letter and Appointment Letter Issuing, Maintain Employees Database, MS Office, MS Excel, OutLook, Naukri.com, Indeed, Linkedin, Facebook, NWAY ERP, NwayERP

      About jobseeker:


    • img_avatar1

      Anup Kumar Yekkala

      Construction/Engineering/Cement/Metals
      25.25 Year Visakhapatnam/Vizag, 30.00 Lacs

      Education :

      Polytechnic 3 Year from Jnan Chandra Ghosh Polytechnic 1995

      Current:

      HEAD PLANT & MACHINERY at Lloyds Infrastructure India Limited

      KeySkills:

      Management

      About jobseeker:

      30+ years experience in Heavy Construction Plant & Machinery


    • img_avatar1

      Hozrat Ali Ahmed

      Construction/Highway/Bridge/Tunnel
      9.0 Year Bongaigaon, 5.15 Lac

      Current:

      HR Business Partner at GANPATI BHARAT PVT LTD

      KeySkills:

      HR Administration,HR Operation,Recruitment,OnBoarding,Payroll Processing,Resume Screening,Interview Scheduling, Offer Letter and Appointment Letter Issuing,Maintain Employees Database,MS Office, MS Excel, OutLook,Naukri.com,Indeed,Linkedin,Facebook

      About jobseeker:


    • img_avatar1

      VIKKI KUMAR

      Construction/Highway/Bridge/Tunnel
      5.0 Year Muzaffarpur, 2.75 Lacs

      Current:

      Store In charge at GANPATI BHARAT PVT LTD

      KeySkills:

      Inward, GRN, Stock Register, Material Receipt, Issue, Material Handling, Physical Verification, STN, outwards, Road Construction, Highways, MIS Reporting, Accounting, Construction, Infrastructure, SAP ERP, Store Keeping, Debit Note, NwayERP

      About jobseeker:


    • img_avatar1

      Mukesh Pegu

      Construction/Highway/Bridge/Tunnel
      12.0 Year Demaji, 5.10 Lacs

      Current:

      HR Executive at GANPATI BHARAT PVT LTD

      KeySkills:

      HR Administration, HR Operation, Recruitment, OnBoarding, Payroll Processing, Resume Screening, Interview Scheduling, Offer Letter and Appointment Letter Issuing, Maintain Employees Database, MS Office, MS Excel, OutLook, Naukri.com, Indeed, Linkedin, Facebook, Airport runway design, NwayERP, NWAY ERP

      About jobseeker:


    • img_avatar1

      NIRBHAY KUMAR SINGH

      Construction/Highway/Bridge/Tunnel
      9.0 Year Ballia, 5.15 Lac

      Education :

      MBA/PGDM from YBNUNIVERSITY 2020

      Current:

      HR Executive at GANPATI BHARAT PVT LTD

      KeySkills:

      HR Administration,HR Operation,Recruitment,OnBoarding,Payroll Processing,Resume Screening,Interview Scheduling, Offer Letter and Appointment Letter Issuing,Maintain Employees Database,MS Office, MS Excel, OutLook,Naukri.com,Indeed,Linkedin,Facebook

      About jobseeker:


    • img_avatar1

      Pradeep Saini

      Construction/Highway/Bridge/Tunnel
      13.0 Year Alwar, 9.60 Lacs

      Education :

      Diploma from Venus Engineering College, Ajmer (Rajasthan)2012 2012

      Current:

      Draughtsman at PMC Buildskills Pvt. Ltd

      KeySkills:

      Account Payable, AutoCAD 2D | Rcdc | Staad Pro | MS Office | AutoCAD

      About jobseeker:

      Diploma in Civil Engineering 13 Year of experinece in Road Highway as a CAD Draughtsman


    • img_avatar1

      THIRUVENKATAM. S

      Construction of Water Supply/Lift Irrigation
      6.6 Year Jaipur, 4.70 Lacs

      Education :

      Diploma from Directorate of Technical Education, Tamil Nadu 2013

      Current:

      Civil Engineer at SOBHA RAJ VILLAS

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kapil Kumar Mahour

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from UPTU University 2014

      Current:

      Assistant Highway Engineer at Highway Engineering Consultant

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Krishna Srinivas Vaibhav

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2013

      Current:

      Assistant Highway Engineer at CC QS –MEP at CBRE

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. SURAJIT SAMANTA

      Construction of Water Supply/Lift Irrigation
      9.9 Year West Medinipur, 5.30 Lacs

      Education :

      B.Tech/B.E. from Maulana A.P.J. Abdul Kalam Azad University of Technology, Kolkata, West Bengal. 2010

      Current:

      Civil Engineer at L&T Construction

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Prashant Pawar

      Construction of Water Supply/Lift Irrigation
      5.5 Year Mumbai, 4.70 Lacs

      Education :

      B.Tech/B.E. from PadmabhushanVasantrodadaPatil Institute of Technology 2015

      Current:

      Senior Manager at OBEROI REALTY PVT.LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SUVAJIT MUKHERJEE

      Construction of Water Supply/Lift Irrigation
      5.5 Year Kolkata, 4.70 Lacs

      Education :

      Diploma from C.E.C 2013

      Current:

      Assistant Highway Engineer at The Bhawanipur Education Society College

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VISHNU KANT

      Construction of Water Supply/Lift Irrigation
      4.4 Year New Delhi, 3.50 Lacs

      Education :

      Diploma from BTE Board Lucknow 2015

      Current:

      Structure Engineer at M/s. RKCIPL -SBCC (JV)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Bhaskar NV

      Construction of Water Supply/Lift Irrigation
      11.11 Year Chinsurah, 8.20 Lacs

      Education :

      B.Tech/B.E. from UVCE 2014

      Current:

      Civil Engineer at Synergy Property Development Services Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Santosh Ghodhke

      Construction of Water Supply/Lift Irrigation
      8.8 Year Pune, 4.70 Lacs

      Education :

      ITI from Latur Bord 2014

      Current:

      Civil Engineer at ABIL Group

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ParnabGanguly

      Construction of Water Supply/Lift Irrigation
      5.5 Year Kolkata, 4.70 Lacs

      Education :

      Diploma from West Bengal State Council of Technical Education(WBSCTE) 2014

      Current:

      Civil Engineer at PASARI MULTI PROJECTS PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MAHESH KUMAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Palwal, 3.50 Lacs

      Education :

      B.Tech/B.E. from Rohtak university haryana 2015

      Current:

      Civil Engineer at Gulshan Homz. pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      GAURAV KUMAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Delhi, 3.50 Lacs

      Education :

      Diploma from Utkal University 2010

      Current:

      Civil Engineer at ATS Infrastructure Limited (ATS)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Bharath.M

      Construction of Water Supply/Lift Irrigation
      7.7 Year Chirala, 4.70 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2014

      Current:

      Civil Engineer at SOBHA LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAMANJAY KUMAR SINGH

      Construction of Water Supply/Lift Irrigation
      15.15 Year Aurangabad, 8.20 Lacs

      Education :

      B.Tech/B.E. from rya College of Engineering and IT, Jaipu 2010

      Current:

      Civil Engineer at ATS Infrastructure Ltd, NOIDA

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ashish Warhekar

      Construction of Water Supply/Lift Irrigation
      8.8 Year Indore, 5.30 Lacs

      Education :

      Diploma from MSBTE mumbai maharashtra 2010

      Current:

      SITE ENGINEER at Laxmi Civil Engineering Services Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ARSAD MOOLA

      Construction of Water Supply/Lift Irrigation
      4.4 Year Birbhum, 3.50 Lacs

      Education :

      B.Tech/B.E. from RGPV, Bhopal 2016

      Current:

      Bridge Engineer at Royal Construction Company

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Bhimsen

      Not Available
      Not Available Jaipur, Not Available

      Education :

      10th from Bhimsen godara 2004

      Current:

      ENGINEER-BILLING & PALNNING at Hi tech ecogreen construction

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Sahil katoch

      Construction/Highway/Bridge/Tunnel
      8.3 Year Kangra, 7.20 Lacs

      Education :

      B.Tech/B.E. from Sri Sai collage of engineering &Technology 2017

      Current:

      Site Engineer at RSB Infra pvt Ltd

      Previous:

      Site Engineer at JS grover construction

      KeySkills:

      Teamwork & Team Building

      About jobseeker:

      Structural Engineer experienced in road, bridge, and culvert construction, site supervision, quality assurance, and project execution.


    • img_avatar1

      DIPENDRA KUMAR

      Not Available
      Not Available Gopalganj, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Manoj Kumar

      Construction of Water Supply/Lift Irrigation
      11.11 Year Hathras, 5.30 Lacs

      Education :

      B.Tech/B.E. from Monad University, Mathura 2010

      Current:

      Civil Engineer at M/s Police Officers Multi-state Co-operative Housing Society. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KOUSIK DEY

      Construction of Water Supply/Lift Irrigation
      7.7 Year Buradhwan, 4.70 Lacs

      Education :

      Diploma from W.B.S.C.T.E 2010

      Current:

      SITE INCHARGE at Cognition Projects Pvt .Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VASANTH.B

      Construction of Water Supply/Lift Irrigation
      8.8 Year Namakkal, 4.70 Lacs

      Education :

      B.Tech/B.E. from Anna University 2012

      Current:

      Manager- Structure at SOBHA LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vivek kumar singh

      Construction of Water Supply/Lift Irrigation
      5.5 Year Sasaram, 4.70 Lacs

      Education :

      B.Tech/B.E. from RGPV Bhopal 2017

      Current:

      Civil Engineer at Desai Construction Pvt Ltd (Gujrat)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      LAKHRAJ KR SAHU

      Construction of Water Supply/Lift Irrigation
      9.9 Year Palamu, 5.30 Lacs

      Education :

      B.Tech/B.E. from Guru Kashi University punjab 2016

      Current:

      Civil Engineer at AGI INFRA LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      NAVEEN CHAND

      Construction of Water Supply/Lift Irrigation
      4.4 Year New Delhi, 3.50 Lacs

      Education :

      B.Tech/B.E. from Maharana Pratap Institute of Technology – Haryana - India 2020

      Current:

      Senior Manager at Mahagun India Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SIVA PRASANTH S

      Construction of Water Supply/Lift Irrigation
      6.6 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from Udaya School of Engineering, Anna University Chennai, Vellamodi. 2016

      Current:

      Senior Manager at SOBHA Lmt.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JITENDRA RAMBHAU ADHAV

      Construction of Water Supply/Lift Irrigation
      10.10 Year Mumbai, 5.30 Lacs

      Education :

      Diploma from Utkal University 2010

      Current:

      SITE ENGINEER at Omkar Realtors & Developers Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. Awadh Narayan Tiwari

      Construction of Water Supply/Lift Irrigation
      5.5 Year Jaunpur, 4.70 Lacs

      Education :

      Diploma from Utkal University 2010

      Current:

      Civil Engineer at VTP REALTY PVT. LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHAILENDRA KUMAR SAMANT

      Construction of Water Supply/Lift Irrigation
      5.5 Year Gorakhpur, 3.50 Lacs

      Education :

      Diploma from Govt polytechnic Gorakhpur 2012

      Current:

      Sr. Structure Engineer at M/s SRK Constructions & Projects Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SUNIT KHAMRUI

      Construction of Water Supply/Lift Irrigation
      7.7 Year Buradhwan, 4.70 Lacs

      Education :

      Diploma from Utkal University 2010

      Current:

      Civil Engineer at THYSSENKRUPP INDUSTRIES INDIA PVT. LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Tejas Banawade

      Construction of Water Supply/Lift Irrigation
      7.7 Year Indore, 4.70 Lacs

      Education :

      PG Diploma from NMIMS Global Access School Bombay 2021

      Current:

      Civil Engineer at Insight Mall Developers Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KIRAN.N.H

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from R.R Institute of Technology, VTU University 2014

      Current:

      Assistant Highway Engineer at SALARPURIA SATTVA

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRASENJIT KARMAKAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Kolkata, 4.70 Lacs

      Education :

      Diploma from Ramakrishna Mission Shilpapitha, Belghariya 2010

      Current:

      Assistant Highway Engineer at Ambuja Neotia

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRINCE KUMAR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ghaziabad, 3.50 Lacs

      Education :

      Diploma from B.T.E.U.P. 2010

      Current:

      Senior Manager at AJAYA INFRA ADVISORS PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      UDAYAN SINGH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Lucknow, 3.50 Lacs

      Education :

      B.Tech/B.E. from I.E.C Collage of Engg.& Technology, Uptu 2013

      Current:

      Civil Engineer at Shalimar Corp limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sujeet A. Vishwakarma

      Construction of Water Supply/Lift Irrigation
      12.12 Year Mumbai, 8.20 Lacs

      Education :

      Diploma from Maharashtra Board 2010

      Current:

      Civil Engineer at Universal Edu. Infra services Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ParagDiwakarBisane

      Construction of Water Supply/Lift Irrigation
      6.6 Year Nagpur, 4.70 Lacs

      Education :

      Diploma from B.T.PolytechnicatNagpur 2013

      Current:

      Senior Manager at SUROJBuildconPvt.Ltd,Pune

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Chitrala Ram Bharath

      Construction of Water Supply/Lift Irrigation
      4.4 Year Bangalore/Bengaluru, 3.50 Lacs

      Education :

      B.Tech/B.E. from G. Pulla Reddy Engineering College (Autonomous) 2013

      Current:

      Senior Manager at Brigade Enterprises Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vipin Kumar Singh

      Construction of Water Supply/Lift Irrigation
      6.6 Year Mau, 4.70 Lacs

      Education :

      Diploma from Utkal University 2011

      Current:

      Civil Engineer at KCC Buildcon Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AMAR SHRIMANT SHENDGE

      Construction of Water Supply/Lift Irrigation
      4.4 Year Pune, 3.50 Lacs

      Education :

      B.Tech/B.E. from Dattakala college of Engineering 2019

      Current:

      SITE ENGINEER at VTP REALTY

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DIPENDU GHOSH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Hooghly, 3.50 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2010

      Current:

      Civil Engineer at RDS Projects limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


Send message