Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      vinay swaroop shrivastava

      Not Available
      Not Available Gwalior, Not Available

      Education :

      B.Sc from jiwaji university 1997

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Ajay viswakarma

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Viralkumar Kiritbhai. Suthar.

      Construction of Water Supply/Lift Irrigation
      7.7 Year Anand, 4.70 Lacs

      Education :

      Diploma from Utkal University 2012

      Current:

      Civil Engineer at Laksh Group

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHARATH K B

      Construction of Water Supply/Lift Irrigation
      10.10 Year Srinagar, 5.30 Lacs

      Education :

      B.Tech/B.E. from JNN College of BE in 65% Engineering, Shimoga 2015

      Current:

      Manager- Structure at Hombale Construction & Estates Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MANI PRAKASH SINGH

      Construction of Water Supply/Lift Irrigation
      6.6 Year Gaya, 4.70 Lacs

      Education :

      MBA/PGDM from Bharti Vidyapeeth 2019

      Current:

      Assistant Highway Engineer at Marc technologies pvt ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JITENDRA YADAV

      Construction of Water Supply/Lift Irrigation
      4.4 Year Siwan, 3.50 Lacs

      Education :

      B.Com from JP University 2012

      Current:

      Senior Manager at SHAPOORJI PALLONJI CORPORATION PRIVATE LIMITED.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Naveen Kumar M

      Construction of Water Supply/Lift Irrigation
      9.9 Year Bangalore/Bengaluru, 5.30 Lacs

      Education :

      B.Tech/B.E. from Anna University, Chennai, India 2013

      Current:

      SITE ENGINEER at Mfar Constructions Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Akhilesh Dahare

      Construction of Water Supply/Lift Irrigation
      5.5 Year Jaipur, 4.70 Lacs

      Education :

      Diploma from R.G.P.V Bhopal 2011

      Current:

      SITE ENGINEER at Lion Engineering Consultants Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      THINESH ANBAZHAGAN

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from GovernmentcollegeofEngineering(Salem) 2014

      Current:

      Senior Manager at SOBHA LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      TAMAL BARMAN

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kolkata, 3.50 Lacs

      Education :

      B.Tech/B.E. from M.A.K.A.U.T(Formerly WBUT) 2010

      Current:

      Civil Engineer at M.A. Construction

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Dipankar Saha

      Construction of Water Supply/Lift Irrigation
      7.7 Year Pune, 4.70 Lacs

      Education :

      B.Tech/B.E. from AISSMS’s, COE, PUNE 2010

      Current:

      Assistant Highway Engineer at CBRE South Asia Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KRISHNA KUMAR SHARMA

      Construction of Water Supply/Lift Irrigation
      11.11 Year Hooghly, 5.30 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2010

      Current:

      SITE ENGINEER at RSPM DEVELOPERS PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PORAS SARDANA

      Construction of Water Supply/Lift Irrigation
      5.5 Year Greater Noida, 4.70 Lacs

      Education :

      B.Tech/B.E. from Chandigarh group of colleges Mohali 2014

      Current:

      SITE ENGINEER at Home kraft infra Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Maulin Patel

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ahmedabad, 3.50 Lacs

      Education :

      M.Tech from LJ INSTITUTE OF ENGINEERING 2020

      Current:

      Civil Engineer at NIL CONSULTING ENGINEER

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ANKUR GOUR

      Construction of Water Supply/Lift Irrigation
      5.5 Year Raisen, 4.70 Lacs

      Education :

      B.Tech/B.E. from Radharam Engineering College Bhopal 2013

      Current:

      Assistant Highway Engineer at WAPCOS Ltd. Bhopal,M.P.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vinay Kumar

      Construction of Water Supply/Lift Irrigation
      15.15 Year Ghaziabad, 8.20 Lacs

      Education :

      Diploma from Govt. polytechnic (UP Board) 2008

      Current:

      Senior Manager at Mahagun Real Estate Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DIBYENDU PANDA

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      ASIM KUMAR DAS

      Not Available
      Not Available Raipur, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      VIKRANT KUMAR

      Construction of Water Supply/Lift Irrigation
      8.8 Year Bijnor, 5.30 Lacs

      Education :

      Diploma from Teerthanker Mahaveer Univerysity 2013

      Current:

      Civil Engineer at DESIGN AXIS , NOIDA

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RASHID RAZA

      Construction of Water Supply/Lift Irrigation
      5.5 Year Gandhidham, 3.50 Lacs

      Education :

      B.Tech/B.E. from City Engineering College, Bangalore. 2017

      Current:

      SITE ENGINEER at Sobha Limted

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Love kush

      Not Available
      Not Available Aligarh, Not Available

      Education :

      Polytechnic 3 Year from I M S POLYTECHNIC, KHUNGAWALI, NEAR BRAZGHAT, J.P. NAGAR 2022

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      RAJ YADAV

      Construction of Water Supply/Lift Irrigation
      5.5 Year Mumbai, 3.50 Lacs

      Education :

      B.Tech/B.E. from UNIVERSITY OF PUNE 2016

      Current:

      Civil Engineer at MIT WPU, PUNE

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mohan Singh Gurjar

      Construction of Water Supply/Lift Irrigation
      7.7 Year Gwalior, 4.70 Lacs

      Education :

      B.Tech/B.E. from Rajiv Gandhi Proudyogiki Vishwavidyalaya 2015

      Current:

      Civil Engineer at Ajay Builders & consultants

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JAYESH HARISHCHANDRA HANAMGHAR

      Construction of Water Supply/Lift Irrigation
      7.7 Year Mumbai, 4.70 Lacs

      Education :

      B.Tech/B.E. from RD’s S.C.S. College of Engineering, Pune 2013

      Current:

      Bridge Engineer at MAJESTIQE LANDMARK’ (PUNE)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vigneshkaran M

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ambaha, 3.50 Lacs

      Education :

      B.Tech/B.E. from Priyadarshini Engineering collage Vaniyambadi 2014

      Current:

      Senior Manager at BRIGADE CORNERSTONE UTHOPIA

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      BISMAYA KUMAR SAHOO

      Construction of Water Supply/Lift Irrigation
      7.7 Year Thane, 4.70 Lacs

      Education :

      Diploma from Arunodaya University 2010

      Current:

      Civil Engineer at MEP

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      NAND LAL SAHANI

      Construction of Water Supply/Lift Irrigation
      4.4 Year Mumbai, 3.50 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2015

      Current:

      SITE ENGINEER at GANPATIGROUP

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ADITYA SURAJ

      Construction of Water Supply/Lift Irrigation
      6.6 Year Muzaffarpur, 4.50 Lacs

      Education :

      B.Tech/B.E. from SDDIET 2018

      Current:

      Assistant Highway Engineer at Dilip Buildcon Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      NITESH KUMA RPRAJAPAT

      Construction of Water Supply/Lift Irrigation
      4.4 Year Allahabad, 3.50 Lacs

      Education :

      Diploma from HanswahiniInstituteofSci ence& TechnologyNainiAl lahabad(BTEUPBOARD 2016

      Current:

      Civil Engineer at PSPProjectsLt

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DIVIK SETHIA

      Construction of Water Supply/Lift Irrigation
      6.6 Year Jaipur, 4.70 Lacs

      Education :

      B.Tech/B.E. from IES IPS Academy, Indore 2014

      Current:

      Assistant Highway Engineer at Gujarat State Police Housing Corporation LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      LEKHRAJ SINGH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Aligarh, 4.70 Lacs

      Education :

      B.Tech/B.E. from MD University Rohtak 2010

      Current:

      Senior Manager at VCL GROUP.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      YOGESH ARYA

      Construction of Water Supply/Lift Irrigation
      9.9 Year Kota, 5.30 Lacs

      Education :

      B.Tech/B.E. from Modi Institute of Technology, Kota 2010

      Current:

      Civil Engineer at Sumangalam Buildmart Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHASHIKESH KUMAR

      Construction/Highway/Bridge/Tunnel
      . Year Bhagalpur, Rs. 500000 - Rs. 600000

      Education :

      MBA/PGDM from Chandigarh University 2025

      Current:

      Executive/ Sr Executive - Administration at ESSEL PROJECTS PVT LTD

      KeySkills:

      Management, Teamwork & Team Building, Attendance Management, HR Administration,HR Operation,Recruitment,OnBoarding,Payroll Processing,Resume Screening,Interview Scheduling, Offer Letter and Appointment Letter Issuing,Maintain Employees Database,MS Office, MS Excel, OutLook,Naukri.com,Indeed,Linkedin,Facebook, Payroll Management, Leave Management, Joining Formalities, PF, ESI Returns, Statutory Compliance

      About jobseeker:


    • img_avatar1

      Bishal chatterjee

      Construction/Highway/Bridge/Tunnel
      5.0 Year Karimganj, 4.30 Lacs

      Current:

      Mechanical Engineer at GANPATI BHARAT PVT LTD

      KeySkills:

      Mechanical Document Management ,RTO,Insurance

      About jobseeker:


    • img_avatar1

      SUNNY VISHNOI

      Construction/Highway/Bridge/Tunnel
      15.0 Year Jaipur, 23.50 Lacs

      Current:

      P & M MANAGER at Tata Projects Limited

      KeySkills:

      Mechanical and Maintenance Skills

      About jobseeker:


    • img_avatar1

      SANT VIR SINGH

      Construction/Highway/Bridge/Tunnel
      13.0 Year Mathura, 10.00 Lacs

      Education :

      B.Tech/B.E. from I.I.M.T. Noida 2013

      Current:

      Structure Engineer at H.M.M. INFRA LTD

      KeySkills:

      Bridge construction and maintenance, Structural Design | Boq | Estimation | Site Execution | Building Construction | Contractor Billing | Sub Contractor Billing | Steel Structures | Road Work | Building Design | Site Engineering | Site Monitoring | Auto CAD

      About jobseeker:


    • img_avatar1

      Vipin Kumar Singh

      Construction/Highway/Bridge/Tunnel
      4.4 Year Mau, Rs. 250000 - Rs. 500000

      Education :

      Diploma from Rishi Ram Naresh 2023

      Current:

      Highway Engineer at Gawar construction limited

      Previous:

      Highway Engineer at Gawar construction limited

      KeySkills:

      Hardware, Highway Engineer

      About jobseeker:


    • img_avatar1

      G.V.V. VARA PRASAD

      Construction of Water Supply/Lift Irrigation
      8.8 Year Kodad, 4.70 Lacs

      Education :

      B.Tech/B.E. from Janardan Rai Nagar Rajasthan Vidyapeeth 2012

      Current:

      Sr. Highway Engineer at M/s.Larsen &Toubro Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VIGNESHWARAN P

      Construction of Water Supply/Lift Irrigation
      5.5 Year Bangalore/Bengaluru, 3.50 Lacs

      Education :

      B.Tech/B.E. from KONGU COLLEGE OF ENGINEERING 2010

      Current:

      Civil Engineer at Prestige Groups

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. MANOHAR ASARAM PATIL

      Construction of Water Supply/Lift Irrigation
      4.4 Year Dhule, 3.50 Lacs

      Education :

      MBA/PGDM from YCMOU Nasik 2021

      Current:

      SITE ENGINEER at D.R.Patil, Government Contractors

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Nilang Hemantbhai Shah

      Construction of Water Supply/Lift Irrigation
      4.4 Year Ahmedabad, 3.50 Lacs

      Education :

      Diploma from William Carey University 2016

      Current:

      Civil Engineer at HUBTOWN PVT.LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VINOD SINGH YADAV

      Construction of Water Supply/Lift Irrigation
      5.5 Year Indore, 3.50 Lacs

      Education :

      M.Tech from Rajiv Gandhi Proudyogiki Vishwavidyalaya, 2018

      Current:

      Senior Manager at E-PACK POLYMERS (P) LTD Greater Noida U.P.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Tushar Dashrath Sawant

      Construction of Water Supply/Lift Irrigation
      5.5 Year Pune, 3.50 Lacs

      Education :

      B.Tech/B.E. from VIIT College of Engineering, Pune 2016

      Current:

      Civil Engineer at Global Group

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ravindra sagar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Latur, 3.50 Lacs

      Education :

      B.Tech/B.E. from SINDHAD ACADAMY OF ENGINEERING 2014

      Current:

      Senior Manager at RUHUL CONSTRUCTION

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Nitesh Kumar

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from Vinawaya mission university 2013

      Current:

      SITE ENGINEER at Unitech Construction Pvt. Ltd.(org)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SANDEEP SHARMA

      Construction of Water Supply/Lift Irrigation
      5.5 Year Bulandshahr, 4.70 Lacs

      Education :

      Diploma from Utkal University 2010

      Current:

      SITE ENGINEER at L&T Construction

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JANARDHANA MV

      Construction of Water Supply/Lift Irrigation
      6.6 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from G madegowda institute of technology 2015

      Current:

      Senior Manager at SK Engineers and constructions

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JANARDHANA D N

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kolar, 3.50 Lacs

      Education :

      Diploma from PAVAN Polytechnic, Kolar 2010

      Current:

      Bridge Engineer at GODREJ PROPERTIES

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      PRAMOD TUKARAM ZATE

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kalyan, 3.50 Lacs

      Education :

      PG Diploma from AICTE Approved, Navi Mumbai, Maharashtra 2010

      Current:

      Senior Manager at HINDWARE SANITARY INDIA LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SURESH BAPURAO KENDRE

      Construction of Water Supply/Lift Irrigation
      7.7 Year Latur, 4.70 Lacs

      Education :

      B.Tech/B.E. from Dr. Babasaheb Ambedkar Technological University 2010

      Current:

      Assistant Highway Engineer at M/s CBRE South Asia Pvt ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


Send message