Browse Listed jobseekers

Total jobseeker found 0

All Registered Jobseekers

You can directly contact with our Registered Jobseekers


Skill
Industry

Browse Job seekers

    • img_avatar1

      RAHUL KUMAR MALI

      Construction of Water Supply/Lift Irrigation
      4.4 Year Jaipur, 3.50 Lacs

      Education :

      B.Tech/B.E. from MAHATMA ROHILKHAND UNIVERSITY, UTTAR PRADESH 2014

      Current:

      Sr. Highway Engineer at EKANA SPORTZ CITY PVT LTD, LUCKNOW

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MD JANE ALAM

      Construction of Water Supply/Lift Irrigation
      6.6 Year Gopalganj, 4.70 Lacs

      Education :

      B.Tech/B.E. from AKTU LUCKNOW (U.P) 2010

      Current:

      SITE ENGINEER at SHUBHAM ASSOCIATES

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vikas Tiwari

      Construction of Water Supply/Lift Irrigation
      5.5 Year Gwalior, 4.70 Lacs

      Education :

      M.Tech from Sri Aurobindo Institute of Technology, Indore (M.P) 2021

      Current:

      SITE ENGINEER at M/s LCC Projects Pvt. Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Rubal Gaur

      Construction of Water Supply/Lift Irrigation
      5.5 Year Ghaziabad, 4.70 Lacs

      Education :

      B.Tech/B.E. from UPTU 2014

      Current:

      Civil Engineer at Nirala Estate

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABHINAV JAIN

      Construction of Water Supply/Lift Irrigation
      4.4 Year Meerut, 3.50 Lacs

      Education :

      B.Tech/B.E. from Shridhar university 2019

      Current:

      Civil Engineer at AJNARA INDIA LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAJKUMAR SINGH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Mumbai, 4.70 Lacs

      Education :

      MS/M.Sc(Science) from VEER BAHADUR SINGH PURANCHAL UNIVERSITY 2010

      Current:

      Civil Engineer at EVERSENDAI CONSTRUCTION PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABHISHEK G SALIAN

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      Diploma from GOVERNMENT POLYTECHNIC COLLEGE, MANIPAL. 2010

      Current:

      SITE ENGINEER at DS MAX PROPERTIES PVT LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Harvinder Singh

      Construction of Water Supply/Lift Irrigation
      8.8 Year Karnal, 5.30 Lacs

      Education :

      Diploma from G.B.N. Govt. Polytechnic Nilokheri (KARNAL) 2011

      Current:

      Project Manager - Construction at IMPERIA STRUCTURES LIMITED

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Subhash Patel

      Construction of Water Supply/Lift Irrigation
      8.8 Year Ghaziabad, 4.70 Lacs

      Education :

      B.Tech/B.E. from “S.G.S.J. Polytechnic, Khurja, B.S.R. 2011

      Current:

      Senior Manager at PC Design private limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sanal Bhagat

      Construction of Water Supply/Lift Irrigation
      8.8 Year Pune, 4.70 Lacs

      Education :

      M.Tech from DY. Patil School of Engineering & Technology Pune University 2020

      Current:

      DPM-Structure at Cbre South Asia Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAKESH YADAV

      Construction of Water Supply/Lift Irrigation
      12.12 Year Ghazipur, 8.20 Lacs

      Education :

      Diploma from J.L.N. Polytechnic Sitapur 2012

      Current:

      Manager- Structure at Gaur Sons India Pvt.Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ANUP SATISH GUNDECHA

      Construction of Water Supply/Lift Irrigation
      6.6 Year Ahmednagar, 4.70 Lacs

      Education :

      B.Tech/B.E. from H.S.B.P.V.T Parikrama, Kashti 2016

      Current:

      Senior Manager at MAHAVIR CONSTRUCTION

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VEERAMANI A

      Construction of Water Supply/Lift Irrigation
      9.9 Year Jaipur, 5.30 Lacs

      Education :

      Diploma from GPT, Krishnagiri 2010

      Current:

      Civil Engineer at PRIDE GROUP

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Nanjundas wamy S

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from Nitte Meenakshi Institute of Technology - Bangalore 2013

      Current:

      Assistant Highway Engineer at AUROBINDO REALTY, Hyderabad, Telangana

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ehtashamuddin

      Construction of Water Supply/Lift Irrigation
      4.4 Year Rajgarh, 3.50 Lacs

      Education :

      B.Tech/B.E. from Mohammad Ali Jauhar University Rampur 2017

      Current:

      Civil Engineer at Vascon Engineers Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      K.JAYAPRAKASH

      Construction of Water Supply/Lift Irrigation
      4.4 Year Vellore, 3.50 Lacs

      Education :

      B.Tech/B.E. from VIT UNIVERSITY, VELLORE. 2017

      Current:

      Civil Engineer at ICON INFRA SHELTERS INDIA PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Shailesh Kuriya

      Construction of Water Supply/Lift Irrigation
      6.6 Year Ahmedabad, 4.70 Lacs

      Education :

      Diploma from GTU 2015

      Current:

      Civil Engineer at Goyal Constructions & Projects Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      KOUSHIK ROY

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kolkata, 3.50 Lacs

      Education :

      Diploma from JNAN CHANDRA GHOSH POLYTECNIC 2012

      Current:

      Senior Manager at sun associate

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SANJAY KUMAR JAIN

      Construction of Water Supply/Lift Irrigation
      6.6 Year Lalitpur, 4.70 Lacs

      Education :

      B.Tech/B.E. from Jiwaji University Gwalior, (M.P.) 2006

      Current:

      Project Manager - Construction at Gruhlaxmi Life Space Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Uddipto chatterjee

      Construction of Water Supply/Lift Irrigation
      9.9 Year North 24 Parganas, 5.30 Lacs

      Education :

      B.Tech/B.E. from WBUT 2017

      Current:

      Civil Engineer at Mfar Constructions Pvt.ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SHINDE GORAKSHNATH B.

      Construction of Water Supply/Lift Irrigation
      15.15 Year Mumbai, 8.20 Lacs

      Education :

      M.A from Utkal University 2010

      Current:

      Civil Engineer at R E Infra Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      VINOD GAUR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Bangalore/Bengaluru, 3.50 Lacs

      Education :

      Diploma from SSLC 2010

      Current:

      SITE ENGINEER at TATA PROJECTS LTD MUMBAI, INDIA

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MrBibekananda Sukai

      Construction of Water Supply/Lift Irrigation
      5.5 Year Purba Medinipur, 4.70 Lacs

      Education :

      Diploma from WBSCTE 2013

      Current:

      DPM-Structure at Desai construction Private Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABHAY SINGH KHARWAR

      Construction of Water Supply/Lift Irrigation
      4.4 Year Deoria, 3.50 Lacs

      Education :

      B.Tech/B.E. from Uttar Pradesh technical university, (U.P 2015

      Current:

      DPM-Highway at Vital Vertex Value Venture Pvt. Ltd.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SIDDARAJ TAKALKI

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bangalore/Bengaluru, 4.70 Lacs

      Education :

      B.Tech/B.E. from Visvesvaraya Technological University 2010

      Current:

      Deputy Project Manager at Puravankara Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      SK KAFI NISHAT HOSSAIN

      Construction of Water Supply/Lift Irrigation
      9.9 Year Bangalore/Bengaluru, 5.30 Lacs

      Education :

      B.Tech/B.E. from JNTU University 2013

      Current:

      SITE ENGINEER at CBRE

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Mr. SHREEKANT NADAGOUD

      Construction of Water Supply/Lift Irrigation
      4.4 Year Bijapur, 3.50 Lacs

      Education :

      B.Tech/B.E. from VTU Belagavi 2019

      Current:

      Manager- Structure at SMONDOVILLE PATEL ENGINEERING LTD

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Kiran Kallapa Birje

      Construction of Water Supply/Lift Irrigation
      12.12 Year Pune, 5.30 Lacs

      Education :

      Diploma from Kolhapur Board 2012

      Current:

      JR. ENGINEER at M/s Peninsula Land Limited.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Vikram Singh

      Construction/Highway/Bridge/Tunnel
      2.2 Year Other City, Rs. 20000 - Rs. 25000

      Education :

      Polytechnic 3 Year from Betup 2022

      Current:

      Site Engineer at HP contractor

      KeySkills:

      Bridge construction and maintenance, Autocad

      About jobseeker:

      A Challenging growth oriented position in an organisation where I can do contribute to take the organisation to greater height through my hard work sincerity and commitment


    • img_avatar1

      GOLAM AZAD

      Construction/Highway/Bridge/Tunnel
      2.2 Year Islampur, Rs. 50000 - Rs. 150000

      Education :

      Polytechnic 3 Year from Swami Vivekanand University 2016

      Current:

      Civil Engineer at Bhavya Construction

      KeySkills:

      Teamwork & Team Building

      About jobseeker:


    • img_avatar1

      Sangeeta Singh

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Shubham Biswas

      Engineering & Construction
      . Year Bardhaman, Rs. 500000 - Rs. 600000

      Education :

      Diploma from Murshidabad Institute Of Technology 2021

      Current:

      Structural Engineer at Bhartiya Infra Project Ltd

      KeySkills:

      Communication, Microsoft Excel, Autocad

      About jobseeker:


    • img_avatar1

      Inderjeet Singh

      Construction Building/Highrise Building/Commerical Building
      . Year Udhampur, 5.00 Lacs

      Education :

      B.Tech/B.E. from Global Research institute of management and technology, Kurukshetra University 2024

      Current:

      GRADUATE ENGINEER TRAINEE at Pgcil

      KeySkills:

      AutoCAD Civil 3D, Leadership, Communication, Decision Making

      About jobseeker:


    • img_avatar1

      Seshasai

      Recruitment
      . Year Guntur, Rs. 15000 - Rs. 20000

      Education :

      Higher Secondary from Sai international 2019

      KeySkills:

      Business Planning

      About jobseeker:


    • img_avatar1

      zUtSLMjzhsjwmySpESKgsypA

      Not Available
      Not Available Not Available, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      BANKAPALLI PUSHPAK

      Construction of Water Supply/Lift Irrigation
      4.4 Year Srikakulam, 3.50 Lacs

      Education :

      M.Tech from PYDAH 2019

      Current:

      Structural Engineer at National Highway project from kodad

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      OM PRAKASH CHOUDHARY

      Construction of Water Supply/Lift Irrigation
      8.8 Year Ranchi, 4.70 Lacs

      Education :

      B.Tech/B.E. from Priyadarshini College of Engineering Nagpur 2011

      Current:

      Sr. Structure Engineer at DIPANSHU PROMOTER AND BUILDERS PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      RAVIN KUMAR

      Construction of Water Supply/Lift Irrigation
      8.8 Year Shamli, 4.70 Lacs

      Education :

      B.Tech/B.E. from Utkal University 2010

      Current:

      Sr. Structure Engineer at MAI ENGINEERS CONSTRUCTION & GAWAR-ATCON (JV)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      JENISH.K

      Construction of Water Supply/Lift Irrigation
      4.4 Year Kangra, 3.35 Lac

      Education :

      Diploma from Gnanadasan polytechnical college affiliated to State board of Technical Education, Chennai 2011

      Current:

      Civil Engineer at Dilip Buildcon Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      MOHD ADIL

      Construction of Water Supply/Lift Irrigation
      7.7 Year Bijnor, 4.70 Lacs

      Education :

      B.Tech/B.E. from MAJU RAMPUR U.P 2018

      Current:

      Assistant Highway Engineer at CENTRODORSTROY INFRA PROJECTS LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Sudarshan Balvant Sutar

      Construction of Water Supply/Lift Irrigation
      8.8 Year Kolhapur, 4.70 Lacs

      Education :

      Diploma from MSBTE 2021

      Current:

      Senior Manager at Jayant K Furnishers, pune

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ABDUL BASIT

      Construction of Water Supply/Lift Irrigation
      5.5 Year Bangalore/Bengaluru, 3.50 Lacs

      Education :

      Diploma from Govt. polytechnic Moradabad 2016

      Current:

      SITE ENGINEER at Flipspace Tech Pvt Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AMAN KUMAR

      Construction of Water Supply/Lift Irrigation
      7.7 Year Muzaffarpur, 4.70 Lacs

      Education :

      B.Tech/B.E. from Punjab Technical University Punjab, India 2014

      Current:

      Project Manager - Construction at Manisha Projects Pvt. Ltd. (MPPL)

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Arun Kumar Mourya

      Construction of Water Supply/Lift Irrigation
      15.15 Year Raisen, 8.20 Lacs

      Education :

      Diploma from Govt.Polytechnic College,Khurai (R.G.P.V, Bhopal) 2011

      Current:

      Jr.Engg. Structure at 1) ISHAAN BUILDERS & DEVELOPERS,Bhopal

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      AVINASH YADAV

      Construction of Water Supply/Lift Irrigation
      5.5 Year Noida, 4.70 Lacs

      Education :

      Diploma from Government Polytechnic Bareilly (U.P) 2010

      Current:

      Senior Manager at Jones Lang LaSalle.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      ROHIT SINGH

      Construction of Water Supply/Lift Irrigation
      5.5 Year Greater Noida, 4.70 Lacs

      Education :

      Diploma from Mahatma Gandhi University, Meghalaya 2014

      Current:

      SITE ENGINEER at Gaur sons’ Hi-Tech Infrastructure Pvt .Ltd

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      DHIRAJ KUMAR SINGH

      Construction of Water Supply/Lift Irrigation
      8.8 Year Patna, 4.70 Lacs

      Education :

      B.Tech/B.E. from Magadh University ,Bihar 2013

      Current:

      Senior Manager at SMS Limited

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Dabhi Hitesh Kumar M.

      Construction of Water Supply/Lift Irrigation
      8.8 Year Ahmedabad, 5.30 Lacs

      Education :

      B.Tech/B.E. from BPTI BHAVNAGAR 2012

      Current:

      Project Manager - Construction at VRAJ INFRASTRUCTURE PVT LTD.

      KeySkills:

      Preparation of Substructure Layout Co-ordinate and Level Like, Pile Centre, Pile Cap, Pier, Pier Cap, Pedestal, Steel Structures, Load-bearing structures, Work Breakdown Structure, Collect all Hindrance Data like- Structure, Electric post, Lamb Post

      About jobseeker:


    • img_avatar1

      Ashish Kumar Yadav

      Not Available
      Not Available Simdega, Not Available

      KeySkills:

      Not Available

      About jobseeker:


    • img_avatar1

      Vickey Kumar Sharma

      Not Available
      Not Available Ballia, Not Available

      Education :

      MBA/PGDM from Faculty of management 2025

      KeySkills:

      Not Available

      About jobseeker:


Send message